FIELD NOTE / LINKEDIN
Record the prediction before the result.
The short film, the complete written thought, and the evidence behind it.
The LinkedIn edition will be linked here after its public post is verified.
Record the prediction before the result.
Video caption
Record the prediction before the result.
The team loses the ability to distinguish learning from rationalization.
Prediction, threshold, trace, dissent and owner action.
What I would require: Agents can run work; owners define acceptable reality.
#EricFieldNotes
Full written post / accessible read
When teams use multiple models to challenge a design, I want a short pre-test record: what each candidate predicts, the threshold for acceptance and who owns the decision. Otherwise the final explanation can be rewritten to fit whatever happened.
Imagine a release whose queue recovery took longer than expected. A model can explain why that delay is reasonable after the fact. The question is whether the product promise allowed it before the test. If no threshold was written, there is no clean verdict.
For the risky path, retain the injected fault, timestamped result and authoritative system readback. Note any dissenting interpretation and the owner's decision to ship, revise or defer. Make the packet small enough that the next agent can retrieve it when a similar path changes.
Let agents implement and execute the probes. Require an engineer to own the prediction and a product owner to own the consequence of a wrong result. Do this because faster code generation increases the number of decisions a team must get right, and model consensus cannot sign for those outcomes.
#EricFieldNotes
Evidence and boundary
On-screen label: ILLUSTRATIVE RELEASE GATE. Illustrative cases are not measured incidents. Research papers and vendor documents support the stated mechanism only within their studied or documented scope.